                                                                        04/19/91
                                     JULLS LONG REPORT


           1. (U) JULLS NUMBER: 31934-03562 (00192), submitted by RILEY
           AFZN-PTM-C, MR WALTER, 856-2225, (913)239-2225.

           2. (U) Operation DESERT SHIELD conducted by USCENTCOM on 02/06/91.

           3. (U) KEYWORDS: PLANNING, RWO (REAL WORLD OPS), USA (US ARMY),
           ACTIVE COMPONENT, GUARD COMPONENT, RESERVE COMPONENT, TRAINING,
           PLANS, EQUIPMENT, ACCOUNTABILITY, CAPABILITY, COORDINATION,
           PERFORMANCE, SURVIVABILITY.

           4. (U) TITLE: LOGISTICS: BATTLE OVERGARMENTS (BDO) SIZING
           OPERATIONS IN THE UNIT


           5. (U) OBSERVATION: Submitted DA 3161 Request for Issue of CDE
           from unit supply personnel often did not reflect proper suit
           size information (only'3 of e available sizes were commonly
           requested).

           6. (U) DISCUSSION: Without BDU sizing operations at the unit or
           coordination of supply personnel with the NBC NCO, personnel
           were not properly outfitted. Units returned to CIF +or
           exchange, and stock levels of common sizes (S, M, L) were
           depleted.

           7.. (U) LESSON LEARNED-. GOC published hot line messages thru
           unit commanders to supply personnel to assure liaison with NBC
           NCOs and/or recording of proper sizing data. The
           messages requested commands to furnish DA 316is 3 or more days
           in advance of scheduled draw thru G3/NBC to DOL Supply and
           Services +or scrutiny. This scrub was preceded by a dry run
           for all units 30 or more days prior to actual draw.

           S. (U) RECOMMENDED ACTION: Add above procedures to furture
           deployment plans.

           9. (U) COMMENTS:     none



           ---  (U) SUBJECT: LOGISTICS


                (U) INTEROPERABILITY: PLANNING

 (U) Action managed by: LOCAL, action worked by:   RAP number:
                Lesson distributed by: LOCAL.












                                       UNCLASSIFIED

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 517 f:/Week-26/BX001008/DESERT STORM AFTER ACTION REPORTS/special information for installation after actio:12179611150511
Control Fields 17
File Room = jul96_declassified
File Cabinet = Week-26
Box ID = BX001008
Unit = 1ST ID
Parent Organization = VII CORPS
Folder Title = DESERT STORM AFTER ACTION REPORTS
Folder Seq # = 11
Subject = SPECIAL INFORMATION FOR INSTALLATION AFTER ACTIO
Document Seq # = 4
Document Date =
Scan Date =
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 17-DEC-1996