Subject: SPECIAL INFORMATION FOR INSTALLATION AFTER ACTION REPORT
Unit: 1ST ID
Parent Organization: VII CORPS
Box ID: BX001008
Folder Title: DESERT STORM AFTER ACTION REPORTS
Document Number: 4
Folder Seq #: 11
UNCLASSIFIED
04/19/91
JULLS LONG REPORT
1. (U) JULLS NUMBER: 30529-15137 (00061), submitted by RILEY
AFZN-EN-YO, CPT WOODS, 856-4210, (913)239-4210.
2. (U) Operation DESERT SHIELD conducted by USCENTCOM on 02/06/91.
3. (U) KEYWORDS: RWO (REAL WORLD OPS), USA (US ARMY), ACTIVE
COMPONENT, LOGISTICS, TRANSPORTATION, AIRLIFT, FAVORABLE,
COORDINATION, INTEROPERABILITY, PLANNING.
4. (U) TITLE: C-2: LOGISTICS: Conflict Between the DCC AND the
DACG (REAR)
5. (U) OBSERVATION: Due to a conflict between the
Transportation OIC in the Deployment Control Center (DCC) and
the DACG (Rear) OIC, the DACS operation got off to a slow and
confusing start.
6. (U) DISCUSSION: The Transportation OIC in the DCC was
opposed to the idea of a centralized POM site and cargo
inspection area. As a result, support +or the plan came slowly
at the expense of the soldiers who were the first to deploy from
Fort Riley. The DACS OIC was not receptive to the idea that the
DACG operation +ell under the direction of the DCC, and as a
result, the reporting process was confusing and unclear +or
several days into the DACS operation.
7. (U) LESSON LEARNED: Any personality conflicts must be "left
at the door" when participating in an operation of this
magnitude. I+ conflicts cannot be resolved, then someone in a
position of influence must resolve the conflict before it
jeopardizes the entire mission.
e. (U) RECOMMENDED ACTION: none
9. (U) COMMENTS: none
--- (U) SUBJECT: COMMAND & CONTROL
(U) INTEROPERABILITY: PLANNING
by: RAP number:
Lesson distributed by: LOCAL.
UNCLASSIFIED
@ -4
Document Page: First | Prev | Next | All | Image | This Release | Search
Document 517 f:/Week-26/BX001008/DESERT STORM AFTER ACTION REPORTS/special information for installation after actio:12179611150511
Control Fields 17
File Room = jul96_declassified
File Cabinet = Week-26
Box ID = BX001008
Unit = 1ST ID
Parent Organization = VII CORPS
Folder Title = DESERT STORM AFTER ACTION REPORTS
Folder Seq # = 11
Subject = SPECIAL INFORMATION FOR INSTALLATION AFTER ACTIO
Document Seq # = 4
Document Date =
Scan Date =
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 17-DEC-1996