Subject: SPECIAL INFORMATION FOR INSTALLATION AFTER ACTION REPORT        

Unit: 1ST ID      

Parent Organization: VII  CORPS  

Box  ID: BX001008

Folder Title: DESERT STORM AFTER ACTION REPORTS                                                               

Document Number:          4

Folder Seq  #:         11






                                      UNCLASSIFIED
                                                                       04/19/91
                                    JULLS LONG REPORT


          1. (U) JULLS NUMBER: 30528-53752 (00060), Submitted by RILEY
          AFZN-EN-YO, CPT WOODS, 856-4210, (913)239-4-@10.

          2. (U) Operation DESERT SHIELD conducted by USCENTCOM on 02/C)6/91.

          3. (U) F:EYWORDS-. RWO (REAL WORLD OPS), USA (US ARMY), ACTIVE
          COMPONENT, LOSISTICS, TRANSPORTATION, AIRLIFT, COORDINATION,
          INTEROF'ERABILITY, PLANNING.

          4. (U) TITLE: C-2, LOGISTICS: Lack of Unity of Command

          5. (U) OBSERVATION:    Disagreements between the DACG (Rear) OIC,
          the DACG (Forward) OIC and the DOL representatives caused many
          problems during the deployment of the Division.

          6. (U) DISCUSSION: As far as I know, no meeting was held prior
          to the movement of the first units from Fort Riley between the
          DACG (Forward) and the DACG (Rear) OICs and representatives from
          the DOL.   This Caused serious confusion throughout the
          deployment as directives from the DACB (Forward) were changed by
          the DOL, directives from the DACS 4Rear) were overruled by the
          DACG (Forward), etc. This confusion spread from the leadership
          to the soldiers from the 34th Engineer Battalion and usually to
          the deploying units.

          7. (U) LESSON LEARNED: Lack of pre-planning contributed to
          disorganization of initial operation.

          S. (U) RECOMMENDED ACTION, Simply conduct a meeting with all of
          the key players in the operation prior to the movement of the
          -First units. Not necessarily a formal briefing, but rather a
          brainstorming session to envision all the problems that could
          arise during the deployment of 12,000 soldiers and what Courses
          of action would be best to solve them.


          9. (U) COMMENTS:     none



        ---  (U) SUBJECT: COMMAND & CONTROL


               (U) INTEROF'ERABILITY: PLANNING


               (U) Action managed by: LOCAL, action worked by:    RAP number:
                Lesson distributed by- LOCAL.












                                      UNCLASSIFIED

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 517 f:/Week-26/BX001008/DESERT STORM AFTER ACTION REPORTS/special information for installation after actio:12179611150511
Control Fields 17
File Room = jul96_declassified
File Cabinet = Week-26
Box ID = BX001008
Unit = 1ST ID
Parent Organization = VII CORPS
Folder Title = DESERT STORM AFTER ACTION REPORTS
Folder Seq # = 11
Subject = SPECIAL INFORMATION FOR INSTALLATION AFTER ACTIO
Document Seq # = 4
Document Date =
Scan Date =
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 17-DEC-1996