Document Page: First | Prev | Next | All | Image | This Release | Search

File: 123096_jul96_decls1_0247.txt
Page: 0247
Total Pages: 517

Subject: SPECIAL INFORMATION FOR INSTALLATION AFTER ACTION REPORT        

Unit: 1ST ID      

Parent Organization: VII  CORPS  

Box  ID: BX001008

Folder Title: DESERT STORM AFTER ACTION REPORTS                                                               

Document Number:          4

Folder Seq  #:         11






                                     UNCLASSIFIED
                                                                     04/19/91
                                   JULLS LONG REPORT


          1. (U) JULLS NUMBER: 30733-56112 (00084), submitted by RILEY
          AFZN-PTM-0, MS HOOKS, 856-3975, (913)239-3975.

          2. (U) Operation DESERT SHIELD conducted by USCENTCOM on 03/01/91.

          3. (U) KEYWORDS: RWO (REAL WORLD OPS), USA (US ARMY), ACTIVE
          COMPONENT, C2 (COMMAND AND CONTROL), SUPPORTABILITY,
          INTEROPERABILITY, PLANNING, STAFF FUNCTIONSI

          4. (U) TITLE: COMMAND AND CONTROL: POST SUPPORT REQUIREMENTS

          5. (U) OBSERVATION: During post deployment, post support
          requirements remain the same at some levels and increased at
          others .(.Casualty Assistance/Family SLtpport/SnowbLtrst/bLtilding
          Security).  However, available equipment and personnel resources
          decrease at a level that is markedly disproportionate to
          remaining tasking requirements.

          6. (U) DISCUSSION: Post support requirements that remain when
          the Division is deployed need to be evaluated and resources
          identified for support.

          7. (LJ) LESSON LEARNED-  A system to ensure a smooth
          transition for meeting the requirements of the installation when
          the Division and other Supporting elements are absent is
          reql(i red.

          S. (U) RECOMMENDED ACTION: Publish guidance -For all standing
          and rotating post support requirements which adds or eliminated
          those activities that are affected by the Division's absence..
          Responsibilities Must be assigned to a purely installation staff
          which can be augmented by nondeploying divisional or
          nondivisional units which may be tasked +or assistance.

          9. (?) COMMENTS:



          --- (U) SUBJECT: COMMAND & CONTROL


              (U) INTEROPERABILITY: PLANNING

: LOCAL.














                                     UNCLASSIFIED

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 517 f:/Week-26/BX001008/DESERT STORM AFTER ACTION REPORTS/special information for installation after actio:12179611150511
Control Fields 17
File Room = jul96_declassified
File Cabinet = Week-26
Box ID = BX001008
Unit = 1ST ID
Parent Organization = VII CORPS
Folder Title = DESERT STORM AFTER ACTION REPORTS
Folder Seq # = 11
Subject = SPECIAL INFORMATION FOR INSTALLATION AFTER ACTIO
Document Seq # = 4
Document Date =
Scan Date =
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 17-DEC-1996