Document Page: First | Prev | Next | All | Image | This Release | Search
File: 123096_jul96_decls1_0254.txt
Subject: SPECIAL INFORMATION FOR INSTALLATION AFTER ACTION REPORT
Unit: 1ST ID
Parent Organization: VII CORPS
Box ID: BX001008
Folder Title: DESERT STORM AFTER ACTION REPORTS
Document Number: 4
Folder Seq #: 11
UNCLASSIFIED
04/19/91
JULLS LONG REPORT
1. (U) JULLS NUMBER: 32547-23845 (00224), submitted by RILEY
PTM-C, MR WALTER, 856-2225, (913)239-2225.
2. (U) Operation DESERT SHIELD conducted by USCENTCOM on 02/06/91.
3. (U) KEYWORDS: RWO (REAL WORLD OPS), USA (US ARMY), GUARD
COMPONENT, RESERVE COMPONENT, C2 (COMMAND AND CONTROL), COMMAND
RELATIONSHIPS, PLANS, UNFAVORABLE, COORDINATION, SUSTAINABILITY,
TRAINING, CRIT3 (IMPORTANT PROBLEM).
4. (U) TITLE: C2: FUNCTION OF RGFR RELATIVE TO NBC TRNG AND
VALIDATION OF RC UNITS
5. (U) OBSERVATION: At few times did Readiness Group Fort Riley
representatives find time available to accomplish the NBC
Training and Validation mission -For the RC.
6. (U) DISCUSSION: Under the Fort Riley Mob Plan, RGFR, becomes
a Mobilization Assistance Team (MAT).
Under the scenario conditions of Desert Shield however their MAT
functions of training and validation did not occur because
(presumably):
MAT is formed only upon partial or full mob, not for the
200k selective callup for Desert Shield.
RGFR Branch Assistance Teams (BAT) exist for the several
units with pure branch affiliation making it possible for those
BAT to serve those units. Since few units have pure chemical
branch affiliation, the Chemical BAT was hard pressed to assist
all RC units in the AO.
As a result, the burden rested first with NBC Division, Ist
ID (M); and in November 90, +ell to DPTM/Post Chemical (NBC
School). With the addition of non-deployables, Post Chemical
was able to accomplish this and other missions simultaneously.
Assistance was requested (from RS-Cml BAT) and derived to
conduct unit inventories at HS for all alerted units to assess
NBC equipment readiness before movement to MS.
7. (U) LESSON LEARNED: RB-Cml BAT requires an incrind in
personnel to support all RC units in its AO.
S. (U) RECOMMENDED ACTION: Plus up the RB, Cml BAT to allow it
to serve all RC units in its AO, especially in peacetime (to
permit a move periodic assessment of NBC equipment readiness).
9. (U) COMMENTS: none
--- (U) SUBJECT. COMMAND & CONTROL
UNCLASSIFIED
@- z.Z
Document Page: First | Prev | Next | All | Image | This Release | Search
Document 517 f:/Week-26/BX001008/DESERT STORM AFTER ACTION REPORTS/special information for installation after actio:12179611150511
Control Fields 17
File Room = jul96_declassified
File Cabinet = Week-26
Box ID = BX001008
Unit = 1ST ID
Parent Organization = VII CORPS
Folder Title = DESERT STORM AFTER ACTION REPORTS
Folder Seq # = 11
Subject = SPECIAL INFORMATION FOR INSTALLATION AFTER ACTIO
Document Seq # = 4
Document Date =
Scan Date =
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 17-DEC-1996