Subject: SPECIAL INFORMATION FOR INSTALLATION AFTER ACTION REPORT        

Unit: 1ST ID      

Parent Organization: VII  CORPS  

Box  ID: BX001008

Folder Title: DESERT STORM AFTER ACTION REPORTS                                                               

Document Number:          4

Folder Seq  #:         11






                                        UNCLASSIFIED
                                                                          04/22/91
                                      ,JULLS LONG REF'ORT


           1. (U) JULLS NUMBER: 22755-16744 (C)C)C)03), Submitted by RILEY
           AFZN-D'=-, MR. CRANMER. 856-3906, (913)23?-3906.

           2. (U) Operation DESERT SHIELD conducted by USCENTCOM on C)21/@)7/91.

           3i (U) @"'EYWORDS, RWO (REAL WORLD OPS), USA (US ARMY), ACTIVE
           COMPONENT, DEPLOYMENT, FACILITIES, CRIT4 (OTHER OBSERVATION),
           COORDINATION, UTILITY SHUT-OFF.

           4. (U) TITLE: DEPLOYMENT: POLICY FOR ELECTRICITY TURN OFF


           5. (U) OBSERVATION: Electricity was completely shut @@ in some
           buildings during a very cold spell. This Caused several pipes
           to freeze and break.


           6. (UN DISCUSSION: Units were given specific intSrL.tCtions iot
           to turn off breakers in buildings. Apparently Some units turned
           off all electricity to their buildings in Rn effort to conserve
           elf--r,tricitv. This did reduce the electrical consumption, b@-t,t
           Caused a Much higher repair bill when the pipes broke.

           7. (U) LESSON LEARNED, Utility shutdown procedures need to be
           .given more priority.

           B. (U) RECOMMENDED ACTION-. DF'TM OF'NS: Insure that UF'ECO
           instructions in deployment plan include and emphasize importance
           @o-F leaving electricity in buildings on.

           9. (?) COMMENTS:



                (U) SUBJECT: DEPLOYMENT


                (U) INTEROPERABILITY: NONE


                (U) Action managed by: LOCAL, action worl-:ed'by:    RAP nLLmber--.
                Lesson distributed by; LOCAL.




















                                        UNCLASSIFIED
                                           ly_q@

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 517 f:/Week-26/BX001008/DESERT STORM AFTER ACTION REPORTS/special information for installation after actio:12179611150511
Control Fields 17
File Room = jul96_declassified
File Cabinet = Week-26
Box ID = BX001008
Unit = 1ST ID
Parent Organization = VII CORPS
Folder Title = DESERT STORM AFTER ACTION REPORTS
Folder Seq # = 11
Subject = SPECIAL INFORMATION FOR INSTALLATION AFTER ACTIO
Document Seq # = 4
Document Date =
Scan Date =
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 17-DEC-1996