Document Page: First | Prev | Next | All | Image | This Release | Search

File: 123096_jul96_decls1_0352.txt
Page: 0352
Total Pages: 517

Subject: SPECIAL INFORMATION FOR INSTALLATION AFTER ACTION REPORT        

Unit: 1ST ID      

Parent Organization: VII  CORPS  

Box  ID: BX001008

Folder Title: DESERT STORM AFTER ACTION REPORTS                                                               

Document Number:          4

Folder Seq  #:         11






                                        UNCLASSIFIED
                                                                            C)4/19/91
                                      JULLS LONG REPORT

           1. (U) JULLS NUMBER: :Y.26:7.ZT,-71491 (0t)237), submitted by RILEY
           AFZN-PTM-C, MR WALTER, 856-2225, (913)239-2225.

           2. (U) Operation DESERT SHIELD conducted by USCENTCOM on C)2/C)6/91.

           3. (U) KEYWORDS: NBC EQUIPMENT, RWO (REAL WORLD OPS), USA (US
           ARMY), C2 (COMMAND AND CONTROL), COMMAND RELATIONSHIPS, PLANS,
           EQUIPMENT, FAVORABLE, CAPABILITY, COORDINATION, PERFORMANCE,
           MATERIEL.


           4. (U) T3TLE: LOGISTICS: BULK DRAW OF CDE CLASS VIII NBC ITEMS


           5. (U) OBSERVATION: Bulk Draw of chemical ensembles and nerve
           agent antidote with pretreatment PM +or the RC units Occurred
           with little difficulty.

           6. (U) DISCUSSION: (a) At the time of joint inventory Of unit
           NBC equipment, Post Chemical representative computed number
           of MARK I NAAK (3/person) and PB tablets (2 blister
           packs/person) required for the unit. NBC representative would
           issue a memorandum with unit document number which authorized
           pickup of NAAK and PB from MEDDAC in proper number.

               (b) NBC representative also hand receipted I or 2 BDO
           sising sets to the unit. The unit then sized its troops,
           recording size BDO, size glove.and chemical overboot. Data was
           jointly posted to preprinted DA'3161, initiLRled,in red
           by NBC representative, and used +or the bulk draw at CIF.
               The CDE warehouse had no X-smalls, few smalls, a
           preponderance of mediums, and some large; hence, mediums were
           substituted +or other sizes.
               Units drew their second ensemble (BDO only) from the
           warehouse along w/2 sl.-.in decon kits, gloves, GVOs/chemical
ower cap") sltffcient to
           complete the first ensemble set but not the second.

           7. (U) LESSON LEARNED: -Established procedures for bulk draws of
           CDE CLASS VII items worked well.


           S. (U) RECOMMENDED ACTION: none


           9. (U) COMMENTS:      none



           --- (U) SUBJECT: LOGISTICS


               (U) INTEROPERABILITY: MATERIEL


               (U) Action managed by: LOCAL, action worked by:        RAP number:
                Lesson distributed by: LOCAL.





                                        UNCLASSIFIED

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 517 f:/Week-26/BX001008/DESERT STORM AFTER ACTION REPORTS/special information for installation after actio:12179611150511
Control Fields 17
File Room = jul96_declassified
File Cabinet = Week-26
Box ID = BX001008
Unit = 1ST ID
Parent Organization = VII CORPS
Folder Title = DESERT STORM AFTER ACTION REPORTS
Folder Seq # = 11
Subject = SPECIAL INFORMATION FOR INSTALLATION AFTER ACTIO
Document Seq # = 4
Document Date =
Scan Date =
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 17-DEC-1996