Document Page: First | Prev | Next | All | Image | This Release | Search
File: 123096_jul96_decls1_0355.txt
Subject: SPECIAL INFORMATION FOR INSTALLATION AFTER ACTION REPORT
Unit: 1ST ID
Parent Organization: VII CORPS
Box ID: BX001008
Folder Title: DESERT STORM AFTER ACTION REPORTS
Document Number: 4
Folder Seq #: 11
UNCLASSIFIED
04/19/91
JULLS LONG REPORT
1. (U) JULLS NUMBER: 32752-66860 (00253), Submitted by RILEY
AFZN-PTM-C, MR. WALTER, 856-2225, (913)239-2225.
2. (U) Operation DESERT SHIELD conducted by USCENTCOM on 02/06/91.
3. (U) KEYWORDS: RWO (REAL WORLD OPS), USA (US ARMY), GUARD
COMPONENT, RESERVE COMPONENT, LIAISON, ORDERS/GUIDANCE, NBC
EQUIPMENT, PLANS, MOBILIZATION, OPLAN (OPERATIONS PLAN), PLANNING,
TRAINING, DIRECTIVES, UNFAVORABLE, CRT1, ACCOUNTABILILTY,
AVAILABILITY, COORDINATION, SURVIVABILITY.
4. (U) TITLE: LOGISTICS: TIMELY FILL OF REQUISITIONS FOR CDE AT
MOBILIZATION STATION
5. (U) OBSERVATION: Shortage identification and cross leveling
attempts at Home Station (HS) were incomplete.
6. (U) DISCUSSION:
a. Attempts by RC units to inventory and conduct
serviceability checks a+ unit CDE were fair to poor, and not
generally done be-Fore alert.
b. At MS, there is not sufficient time to:
(1) Draw from Rc storage sites.
(2) Inventory.
(3) Process requisitions.
(4) Receive fill before completion of railroad.
C. Hence, MS had to require on post units to release
authorized pieces a+ needed equipment or request fill +ram state
USPF&OS, Fifth U.S. Army or U.S. Army MATES in order for the
unit to deploy with even individual NBC protective equipment.
7. (?) LESSON LEARNED:
e. (U) RECOMMENDED ACTION:
a. To assure timely receipt of requisitions (at Supply &
Services, DOL, MS), skilled MOS 54B personnel must:
(1) Inform units be-Fore alert of expectations in CDE
adiness using Fifth U.S. Army approved checklist of actions,
attached.
(2) Conduct comprehensive inventory of NBC equipment at
HS.
UNCLASSIFIED
@- Id 4
Document Page: First | Prev | Next | All | Image | This Release | Search
Document 517 f:/Week-26/BX001008/DESERT STORM AFTER ACTION REPORTS/special information for installation after actio:12179611150511
Control Fields 17
File Room = jul96_declassified
File Cabinet = Week-26
Box ID = BX001008
Unit = 1ST ID
Parent Organization = VII CORPS
Folder Title = DESERT STORM AFTER ACTION REPORTS
Folder Seq # = 11
Subject = SPECIAL INFORMATION FOR INSTALLATION AFTER ACTIO
Document Seq # = 4
Document Date =
Scan Date =
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 17-DEC-1996