                                     JULLS LONG REPORT

           1. (U) JULLS NUMBER: @274e-i9393 (Oo251), submitted by RILEY
           AFKB-RG-FR, CPT KING, e56-3336, (913)239-3336.

           2. (U) Operation DESERT SHIELD conducted by USCENTCOM on 03/13/91.

           3. (U) KEYWORDS: TRANSPORTATION, TRANSPORTATION ASSETS, PLANNING,
           RWO (REAL WORLD OPS), USA (US ARMY), (3UARD COMF-ONENT, RESERVE
           COMPONENT, C2 (COMMAND AND CONTROL), MOBILIZATION, EQUIPMENT,
           UNFAVORABLE, COORDINATION, PRIORITY, SUPF,ORTABILITY, MATERIEL,
           CRIT2 (SERIOUS PROBLEM).


           4. (U) TITLE: LOGISTICS: SHORTAGE OF TRANSPORTATION RESOURCES

           5. (U) OBSERVATION: Shortages of CONEX containers and MILVANS
           were experienced at mobilization station.

           6. (U) DISCUSSION: The shortage of CONEX containers and MILVANS
           after the deployment of the Ist Infantry Division (M) affected
           the deployment dates of the 410th Evacuation Hospital. Due to
           this shortage, a commercial transportation company was contacted
           to supply shipping containers and move the equipment. This
           resulted in a lengthening of shipping time for the Ltnit's
           vehicles and CTA deployable equipment. This raised the
           potential of unit personnel being in Country 2-3 weeks before
           the arrival of tentage and equipment necessary to house and feed
           the unit. Because of this situation, ship dates and contractors
           were renegotiated and deployment dates were again lengthened. It
           was 69 days after being mobilized be-Fore the 410th Evacuation
           Hospital deployed to the theater of operation. Similar
           Situations took place with the 170th Maintenance Co., and the
           403rd F'W Camp.

's Must plan
           for RC unit transportation requirements.

           S. (U) RECOMMENDED ACTION: AUEL data for all deploying units
           Must be compared with existing transportation resources at the
           mobilization station. Units will continue to deploy and require
           resources after the Ist ID (M) departs.

           9. (UY-COMMENTS:     none



           --- (U) SUBJECT: LOGISTICS


               (U) INTEROPERABILITY: PLANNING

               (U) Action managed by: LOCAL, action worked by:      RAP number.
                Lesson distributed by, LOCAL.






                                       UNCLASSIFIED

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 517 f:/Week-26/BX001008/DESERT STORM AFTER ACTION REPORTS/special information for installation after actio:12179611150511
Control Fields 17
File Room = jul96_declassified
File Cabinet = Week-26
Box ID = BX001008
Unit = 1ST ID
Parent Organization = VII CORPS
Folder Title = DESERT STORM AFTER ACTION REPORTS
Folder Seq # = 11
Subject = SPECIAL INFORMATION FOR INSTALLATION AFTER ACTIO
Document Seq # = 4
Document Date =
Scan Date =
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 17-DEC-1996