Document Page: First | Prev | Next | All | Image | This Release | Search
File: 123096_jul96_decls1_0359.txt
Subject: SPECIAL INFORMATION FOR INSTALLATION AFTER ACTION REPORT
Unit: 1ST ID
Parent Organization: VII CORPS
Box ID: BX001008
Folder Title: DESERT STORM AFTER ACTION REPORTS
Document Number: 4
Folder Seq #: 11
UNCLASSIFIED
04/19/91
JULLS LONG REPORT
1. (U) JULLS NUMBER% 32754-60308 (00257), submitted by RILEY
AFZN-DL-T, MR. ZACHARIAS, 856-3041, (913)239-3041.
2. (U) Operation DESERT SHIELD conducted by USCENTCOM on 02/05/91.
3. (U) KEYWORDS: RWO (REAL WORLD OPS), USA (US ARMY), ACTIVE
COMPONENT, LOGISTICS, TRANSPORTATION, AIRLIFT, INTEROPERABILITY,
MATERIEL, PLANNING, UNFAVORABLE, CRT3, ACCOUNTABILITY.
4. (U) TITLE: LOGISTICS: BUMP BAGS ON COMMERCIAL AIRCRAFT
5. (U) OBSERVATION: Bumped bags were not properly located or
identified.
6. (U) DISCUSSION: During the first half of the deployment, the
"bump" bags were not properly located and identified. Bump bags
(rt.tcks and A&B) should not be on separate truck or marked with
ENG TAPE and placed on the trailer first, to be the last off
loaded.
7. (U) LESSON LEARNED: Need plan for procedure% to handle
"bump" bags.
S. (U) RECOMMENDED ACTION: Bump bags should follow the criteria
below-
747 - All above 350.
DC-10 - 15.
L1011 - 15.
390 pax - 40 pers bump plan.
There should be no less than 15 bump persons +or each flight.
The DACG rear developed a plan that bump persons were the last
ones listed on the manifest. Action is installation and
deploying units.
9. (>) COMMENTS:
--- (U) SUBJECT: LOGISTICS
(U) INTEROPERABILITY: PLANNING
(U) Lesson distributed by: LOCAL.
UNCLASSIFIED
Document Page: First | Prev | Next | All | Image | This Release | Search
Document 517 f:/Week-26/BX001008/DESERT STORM AFTER ACTION REPORTS/special information for installation after actio:12179611150511
Control Fields 17
File Room = jul96_declassified
File Cabinet = Week-26
Box ID = BX001008
Unit = 1ST ID
Parent Organization = VII CORPS
Folder Title = DESERT STORM AFTER ACTION REPORTS
Folder Seq # = 11
Subject = SPECIAL INFORMATION FOR INSTALLATION AFTER ACTIO
Document Seq # = 4
Document Date =
Scan Date =
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 17-DEC-1996