Subject: SPECIAL INFORMATION FOR INSTALLATION AFTER ACTION REPORT        

Unit: 1ST ID      

Parent Organization: VII  CORPS  

Box  ID: BX001008

Folder Title: DESERT STORM AFTER ACTION REPORTS                                                               

Document Number:          4

Folder Seq  #:         11






                                      UNCLASSIFIED
                                                                       04/19/91
                                     JULLS LONG REPORT

            1. (U) JULLS NUMBER: 32756-34443 (00261), submitted by RILEY
            AFZN-DL-TM, MR. ATCHISON, 856-3420, (913)239-3420.

            2. (U) Operation DESERT SHIELD conducted by USCENTCOM on 02/07/91.

            3. (U) KEYWORDS: RWO (REAL WORLD OPS), USA (US ARMY), ACTIVE
            COMPONENT, LOGISTICS, FACILITIES, TRANSPORTATION, RAIL MOVEMENT,
            INTEROPERABILITY, MATERIEL, UNFAVORABLE, CRT2, AVAILABILITY.

            4. (U) TITLE: Logistics: Railcar Switching

            5'. (U) OBSERVATION: Delayed loading times.

            6. (U) DISCUSSION: Some delays in loading times were
            experienced as a result of car switching. This occured normally
            when the passing track was in operation as a loading site. When
            this occured, the railroad had no car holding area in Funston
            for loaded or empties. Therefore, switch engines had to make
            runs into their Junction City yards with loaded cars and return
            with empties, Which was time consuming.

            7. (U) LESSON LEARNED, More loading spurs are needed that could
            reduce railloadi;ng time in half.

            B. (U) RECOMMENDED ACTION: That the installation pursue the
            NATO funded project to construct six additional loading spurs in
            the Funston area. This project would cut railroad time in half
            for a division deployment, and trains would not have to leave
            the installation until they are ready to be pulled by the
            servicing railroad. Action is installation.

            9. (?) COMMENTS,



            --- (U) SUBJECT: LOGISTICS


                (U) INTEROPERABILITY: PLANNING

                (U) Lesson distributed by: LOCAL.

















                                       UNCLASSIFIED

                      -T-13?-

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 517 f:/Week-26/BX001008/DESERT STORM AFTER ACTION REPORTS/special information for installation after actio:12179611150511
Control Fields 17
File Room = jul96_declassified
File Cabinet = Week-26
Box ID = BX001008
Unit = 1ST ID
Parent Organization = VII CORPS
Folder Title = DESERT STORM AFTER ACTION REPORTS
Folder Seq # = 11
Subject = SPECIAL INFORMATION FOR INSTALLATION AFTER ACTIO
Document Seq # = 4
Document Date =
Scan Date =
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 17-DEC-1996