Subject: SPECIAL INFORMATION FOR INSTALLATION AFTER ACTION REPORT        

Unit: 1ST ID      

Parent Organization: VII  CORPS  

Box  ID: BX001008

Folder Title: DESERT STORM AFTER ACTION REPORTS                                                               

Document Number:          4

Folder Seq  #:         11






                                      UNCLASSIFIED
                                                                       o4/19/91
                                    JULLS LONG REPORT


           1. (U) JULLS NUMBER: 32755-37434 (00259), submitted by RILEY
           AFZN-DL-TM, MR. ATCHISON, 856-342o. (913)239-3420.

           2. (U) Operation DESERT SHIELD conducted by USCENTCOM on 02/c-')7/91.

              (U) KEYWORDS- RWO (REAL WORLD OPS), USA (US ARMY), ACTIVE
           COMPONENT, C2 (COMMAND AND CONTROL), ORDERS/GUIDANCE,
           TRANSPORTATION, RAIL MOVEMENT, INTEROPERABIL-ITY, PLANNING,
           UNFAVORABLE, CRT2, LEADERSHIP.

           4. (U) TITLE: COMMAND & CONTROL: SUPPORT TASKING FOR RAILLOADING


           5. (U) OBSERVATION: EqLtipment/operator no shows, provided
           equipment not mission capable, and requirement +or formal
           tas@.,.ings.                             I

           6, IU) DISCUSSION: During -ail operations, not all tasked
           equipment was provided due to equipment shortages. Equipment
           that was provided arrived without being fully mission capable
           (i.e., missing slings for cranes, no slave cables -For wreckers,
           etc.). Operators oh numerous occasions arrived late and only
           after numerous calls were made to the supporting unit.
           Submission of numerous taskings only confused requirements.

           7. (U) LESSON LEARNED: Proper command and control by the
           deploying units Could have alleviated this issue.

           S. (U) RECOMMENDED ACTION: That tasked equipment arrive fully
           Mission capable and that tasked operators stay constant
           throughout the operation except for emergency. Shortaae of
           equipment should be contracted early on. Required tasking
           should be stated in the OPLAN with DOL, Transportation Division
           being required only to give required time line of operators.

           9.    COMMENTS,



OMMAND & CONTROL


               (U) INTEROF,ERABILITY: PLANNING


               (U) Lesson distributed by: LOCAL.














                                      UNCLASSIFIED

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 517 f:/Week-26/BX001008/DESERT STORM AFTER ACTION REPORTS/special information for installation after actio:12179611150511
Control Fields 17
File Room = jul96_declassified
File Cabinet = Week-26
Box ID = BX001008
Unit = 1ST ID
Parent Organization = VII CORPS
Folder Title = DESERT STORM AFTER ACTION REPORTS
Folder Seq # = 11
Subject = SPECIAL INFORMATION FOR INSTALLATION AFTER ACTIO
Document Seq # = 4
Document Date =
Scan Date =
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 17-DEC-1996