                                    JULLS LONG REPORT

           1. (U) JULLS NUMBER: 32755-78661 (00260), submitted by RILEY
           AFZN-DL-TM, MR. ATCHISON, 856-3420, (913)239-3420.

           2. (U) Operation DESERT SHIELD conducted by USCENTCOM on 02/07/91.

           3. (U) KEYWORDS: RWO (REAL WORLD OPS), USA (US ARMY), ACTIVE
           COMPONENT, C2 (COMMAND AND CONTROL), ORDERS/GUIDANCE,
           TRANSPORTATION, RAIL MOVEMENT, INTEROPERABILITY, PLANNING,
           UNFAVORABLE, CRT3, LEADERSHIP.

           4. (U) TITLE: COMMAND & CONTROL: SECONDARY LOADS

           5. (U) OBSERVATION: Secondary loads not properly secured.

           6. (U) DISCUSSION- Numerous vehicles early on arrived at the
           rail staging areas with secondary loads improperly secured
           causing some delays in loading the equipment on the railcars.

           7. (U) LESSON LEARNED: Proper training and prior inspection
           should eliminate secondary loads not being properly secured.

           S. (U) RECOMMENDED ACTION: That an alert holding area be
           established at a central location for equipment processing prior
           to equipment arrival at railhead, eliminating the requirement
           to fully inspect equipment at the loading site. Action is
           installation and deploying units.

           9. (?) COMMENTS:



           --- (U) SUBJECT: COMMAND & CONTROL

               (U) INTEROPERABILITY: PLANNING


               (U) Lesson distributed by: LOCAL.






















                                       UNCLASSIFIED

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 517 f:/Week-26/BX001008/DESERT STORM AFTER ACTION REPORTS/special information for installation after actio:12179611150511
Control Fields 17
File Room = jul96_declassified
File Cabinet = Week-26
Box ID = BX001008
Unit = 1ST ID
Parent Organization = VII CORPS
Folder Title = DESERT STORM AFTER ACTION REPORTS
Folder Seq # = 11
Subject = SPECIAL INFORMATION FOR INSTALLATION AFTER ACTIO
Document Seq # = 4
Document Date =
Scan Date =
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 17-DEC-1996