Document Page: First | Prev | Next | All | Image | This Release | Search

File: 123096_jul96_decls1_0300.txt
Page: 0300
Total Pages: 517

Subject: SPECIAL INFORMATION FOR INSTALLATION AFTER ACTION REPORT        

Unit: 1ST ID      

Parent Organization: VII  CORPS  

Box  ID: BX001008

Folder Title: DESERT STORM AFTER ACTION REPORTS                                                               

Document Number:          4

Folder Seq  #:         11






                                     UNCLASSIFIED
                                                                     04/19/91
                                   JULLS LONG REPORT

          1. (U) JULLS NUMBER: 30440-39649 (00043), submitted by RILEY
          AFZN-F'TM-T, MR. MROZINS@.-.'.I, 856-3477, (913)239-3477.

          2. (U) Operation DESERT SHIELD conducted by USCENTCOM on 01/23/91.

           . (U) KEYWORDS: RWO (REAL WORLD OPS), USA (US ARMY), ACTIVE
          COMPONENT, LOGISTICS, EQUIPMENT, ACCOUNTABILITY, INTEROPERABILITY,
          TRAINING.


          4. (U) TITLE: LOGISTICS: TDA AUDIOVISUAL/VISUAL INFORMATION
          EQUIPMENT, TNG DEVICES, TVEQ

          5. (U) OBSERVATION- The Ist Infantry Division (MECH) and Fort
          Riley units deployed to Saudi Arabia on Operation Desert Shield
          without clearing'all Training Support Center (TSC) Outstanding
          hand receipts.

          6. (U) DISCUSSION: Units deploying left Fort Riley during the
          months of November and December 1990 without totally clearing
          hand receipts. ALtdiOViSLtal/ViSLtal information equipment and
          devices were shipped to Saudi Arabia without TSC notification
          and permission to remove TDA property from the installation.

          7. (U) LESSON LEARNED: In any -Future deployments, units will
          not be permitted to leave the installation until all outstanding
          hand receipts are cleared with hand receipt holders. I+, units'
          depart without clearing hand receipts, the unit commander will
          be held accountable +or all equipment by either a Report of
          SLtrve or Statement of Charges. All equipment is the TSC's TDA.
          Authorization to remove equipment from the installation may be
          granted by the Commanding General.

          B. (U) RECOMMENDED ACTION- That prior coordination -For removal
          of TDA equipment be e++ected between deploying unit and TSC so
e followed.

          9. (U) COMMENTS:    none



          --- (U) SUBJECT: LOGISTICS


              (U) INTEROF,ERABILITY: TRAINING


              (U) Action managed byz LOCAL, action worked by:   RAP number:
               Lesson distributed by- LOCAL.










                                     UNCLASSIFIED


                                       @--) I

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 517 f:/Week-26/BX001008/DESERT STORM AFTER ACTION REPORTS/special information for installation after actio:12179611150511
Control Fields 17
File Room = jul96_declassified
File Cabinet = Week-26
Box ID = BX001008
Unit = 1ST ID
Parent Organization = VII CORPS
Folder Title = DESERT STORM AFTER ACTION REPORTS
Folder Seq # = 11
Subject = SPECIAL INFORMATION FOR INSTALLATION AFTER ACTIO
Document Seq # = 4
Document Date =
Scan Date =
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 17-DEC-1996