Subject: SPECIAL INFORMATION FOR INSTALLATION AFTER ACTION REPORT        

Unit: 1ST ID      

Parent Organization: VII  CORPS  

Box  ID: BX001008

Folder Title: DESERT STORM AFTER ACTION REPORTS                                                               

Document Number:          4

Folder Seq  #:         11






                                      UNCLASSIFIED
                                                                      04/19/91
                                    JULLS LONG REPORT


           1. (U) JULLS NUMBER: 30450-91747 (00052), submitted by RILEY
           AFZN-EN-YO, CPT WOODS, 856-4210, (913)239-4210.

           2. (U) Operation DESERT SHIELD Conducted by USCENTCOM on 02/06/91.

           3. (U) KEYWORDS: RWO (REAL WORLD OPS), USA (US ARMY), ACTIVE
           COMPONENT, LOGISTICS, TRANSPORTATION, AIRLIFT, COORDINATION,
           PLANNING.


           4. (U) TITLE: LOGISTICS: MOVING PASSENGER CHALKS FORWARD

           5. (U) OBSERVATION: Decision was never reached on whether to
           send passengers from the POM site at Fort Riley to Forbes Field
           be-Fore aircraft arrived at Forbes, or wait until the plane was
           actually an the ground.

           6. (U) DISCUSSION: This indecision proved confusing to the DACG
           (Rear) and the DACS (Forward) personnel, as well as chalk
           commanders and passengers. Some chalk commanders refused to
           board busses until their plane was on the ground and, rightfully
           so, knowing the accommodations at Forbes Field.

           7. (U) LESSON LEARNED: Again, this problem could have been
           worked out at a predeployment meeting involving all the DACS key
           players. Also, those people who request aircraft through MAC
           must stipulate that aircraft remain an the ground for at least 4
           hours so that passengers could remain at Fort Riley until wheels
           down and still have enough time to load the aircraft.

           B. (U) RECOMMENDED ACTION: That coordination/planning meeting
           be conducted prior to establishing DACG operations to clarify
           procedures.

           9. (U) COMMENTS:    none



           --- (U) SUBJECT: LOGISTICS

               (U) INTEROPERABILITY: PLANNING

umber:
                Lesson distributed by: LOCAL.














                                      UNCLASSIFIED


                                         @ -7/

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 517 f:/Week-26/BX001008/DESERT STORM AFTER ACTION REPORTS/special information for installation after actio:12179611150511
Control Fields 17
File Room = jul96_declassified
File Cabinet = Week-26
Box ID = BX001008
Unit = 1ST ID
Parent Organization = VII CORPS
Folder Title = DESERT STORM AFTER ACTION REPORTS
Folder Seq # = 11
Subject = SPECIAL INFORMATION FOR INSTALLATION AFTER ACTIO
Document Seq # = 4
Document Date =
Scan Date =
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 17-DEC-1996