                                    JULLS LONG REPORT


           1. (U) JULLS NUMBER: 30456-85634 (00059), submitted by RILEY
           AFZN-EN-YO, CPT WOODS, 856-4210, (913)239-4210.

              (U) Operation DESERT SHIELD conducted by USCENTCOM on 02/06/91.

           3. (U) KEYWORDS: RWO (REAL WORLD OPS), USA (US ARMY), ACTIVE
           COMPONENT, LOGISTICS, EQUIPMENT, AVAILABILITY, INTEROPERABILITY,
           MATERIEL.


           4. (U) TITLE: LOGISTICS: Availability of Forklift

           5. (U) OBSERVATION: At the outset a+ the DACG mission, A
           Company, 34th Engineer Battalion did not have access to a
           forklift.


           6. (U) DISCUSSION, It was not until approximately 2 weeks into
           the operation that a forklift was provided by DOL for full time
           use by the DACS (Rear). Up until that point, each time a
           forklift was needed, the DACG (Rear) had to call vehicle
           processing and have a civilian operator bring the forklift to
           wherever it was needed. Needless to say, this became a
           tremendous problem on weekends and nights.

           7. (U) LESSON LEARNED: At the meeting held prior to the start
           of the DACG mission, vehicle and equipment requirements must be
           addressed so that by the time the first cargo must be uploaded,
           the assets needed are in place. Decision makers at the Division
           level must be willing to authorize lease of civilian equipment
           rapidly based on recommendations from the DACG OIC.

           S. (U) RECOMMENDED ACTION: That planning -For future deployments
           include a coordination meeting to identify DACG operational and
           support requirements.

           9. (U) COMMENTS:    none



           --- (U) SUBJECT: LOGISTICS


               (U) INTEROPERABILITY: MATERIEL

anaged by: LOCAL, action worked by: , RAP number:
                Lesson distributed by: LOCAL.













                                      UNCLASSIFIED

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 517 f:/Week-26/BX001008/DESERT STORM AFTER ACTION REPORTS/special information for installation after actio:12179611150511
Control Fields 17
File Room = jul96_declassified
File Cabinet = Week-26
Box ID = BX001008
Unit = 1ST ID
Parent Organization = VII CORPS
Folder Title = DESERT STORM AFTER ACTION REPORTS
Folder Seq # = 11
Subject = SPECIAL INFORMATION FOR INSTALLATION AFTER ACTIO
Document Seq # = 4
Document Date =
Scan Date =
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 17-DEC-1996