Subject: SPECIAL INFORMATION FOR INSTALLATION AFTER ACTION REPORT        

Unit: 1ST ID      

Parent Organization: VII  CORPS  

Box  ID: BX001008

Folder Title: DESERT STORM AFTER ACTION REPORTS                                                               

Document Number:          4

Folder Seq  #:         11






                                     UNCLASSIFIED
                                                                      o4/19/91
                                   JULLS LONG REPORT


          1. (U) JULLS NUMBER: 30731-40430 (00080), submitted by RILEY
          AFZN-PTM-0, MR WOLFF, 856-3se7, (913)239-3887.

          2. (U) Operation DESERT SHIELD conducted by USCENTCOM on 03/01/91.

          3. (U) KEYWORDS- RWO (REAL WORLD OPS), USA (US ARMY), ACTIVE
          COMPONENT, LOGISTICS, EQUIPMENT, FAVORABLE, ACCOUNTABILITY,
          INTEROPERABILITY, MATERIEL.

          4. (U) TITLE, LOGISTICS: PROPERTY BOOK RECORDS


          5. (U) OBSERVATION: Some force modernization equipment
          +ieldings were degraded due to inaccurate property boo@.-. records.

          6. (U) DISCUSSION: HQ, DA directed Force Mad to provide Ist
          Infantry Division (Mech) MTOE shortage document numbers to DA to
          enable DA to force-isslie a critical system (AN/PVS-7s) to the
          Division prior to deployment. Data provided by Division F'BO had
          to be resubmitted twice due to errors in the data. The G4
          reported unit on-hand quantities, which did not always match
          quantity on-hand in PBO records. The quantity of AN/PVS-7s on
          requisition did not match the quantity short +or the Division.
          Units having shortages did not necessarily have dtte-in
          requisitions. Units having 104)% or more of equipment on-hand
          still had open requisitions. After two revisions, even though
          some errors still were obvious, the data had to be@SLibmitted to
          DA in order to receive the goggles prior to deployment.
          Although the majority of the shortages were identified and
          filled, all were not.

          7. (U) LESSON LEARNED: The dynamic nature of information
          exchange between units and PBO creates inevitable +laws in the
          PBO record database. Such data must be reviewed for accuracy
on to equipment fieldings.

          B. (U) RECOMMENDED ACTION: Command emphasis be reinforced
          regarding routine unit review of MTOE shortage status in
          coordination with the appropriate F'BO Team Chief.

          9. (?) COMMENTS:



          --- (U) SUBJECT: LOGISTICS


              (U) INTEROPERABILITY: MATERIEL


              (U) Lesson distributed by: LOCAL.








                                     UNCLASSIFIED

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 517 f:/Week-26/BX001008/DESERT STORM AFTER ACTION REPORTS/special information for installation after actio:12179611150511
Control Fields 17
File Room = jul96_declassified
File Cabinet = Week-26
Box ID = BX001008
Unit = 1ST ID
Parent Organization = VII CORPS
Folder Title = DESERT STORM AFTER ACTION REPORTS
Folder Seq # = 11
Subject = SPECIAL INFORMATION FOR INSTALLATION AFTER ACTIO
Document Seq # = 4
Document Date =
Scan Date =
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 17-DEC-1996