                                                                     04/19/91
                                   JULLS LONG REPORT


          1. (U) JULLS NUMBER: 3Oe49-56877 (00114), submitted by RILEY
          AFYA-BC, MSG GATLING, e56-6330, (913)239-6330.

          2. (U) Operation DESERT SHIELD conducted by USCENTCOM on 02/c.)5/91.

          3. (U) KEYWORDS-. RWO (REAL WORLD OPS), USA (US ARMY), ACTIVE
          COMPONENT, C2 (COMMAND AND CONTROL), ORDERS, FAVORABLE,
          ACCOUNTABILITY, INTEROPERABILITY, PLANNING.

          4. (U) TITLE: LOGISTICS: UPECO: No Knowledge of Responsibilities

          5. (U) OBSERVATION: Lack Of unit and UPECO representative
          knowledge of responsibilities IAW Lexicon Danger Plan.

          6. (U) DISCUSSION: During pre-UPECO check, it was discovered
          repeatedly by 3rd Battalion representatives that unit UPECO
          representatives as well as unit commanders did not have
          knowledge of their responsibilities outlined in Lexicon Danger
          Plan. Additionally, several units did not have a copy of the
          Lexicon Danger Plan.

          7. (U) LESSON LEARNED-. Commanders must ensure that all planning
          guidance is provided to appropriate unit personnel.

          e. (U) RECOMMENDED ACTION: That commanders at all levels ensure
          that written.plans/op orders/-Frag orders are received by all who
          are involved in the exercise. If pre-UPECO checks had not been
          conducted, this problem would not have surfaced until actual
          deployment which would have caused a delay in the Ltnit's
          preparation -For departure.

          9. (U) COMMENTS-    none



          --- (U) SUBJECT.- LOGISTICS


              (U) INTEROPERABILITY: PLANNING


              (U) Action managed by-. LOCAL, action worked by:  RAP number:
               Lesson distributed by: LOCAL.
















                                     UNCLASSIFIED

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 517 f:/Week-26/BX001008/DESERT STORM AFTER ACTION REPORTS/special information for installation after actio:12179611150511
Control Fields 17
File Room = jul96_declassified
File Cabinet = Week-26
Box ID = BX001008
Unit = 1ST ID
Parent Organization = VII CORPS
Folder Title = DESERT STORM AFTER ACTION REPORTS
Folder Seq # = 11
Subject = SPECIAL INFORMATION FOR INSTALLATION AFTER ACTIO
Document Seq # = 4
Document Date =
Scan Date =
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 17-DEC-1996