Document Page: First | Prev | Next | All | Image | This Release | Search
File: 123096_jul96_decls1_0366.txt
Subject: SPECIAL INFORMATION FOR INSTALLATION AFTER ACTION REPORT
Unit: 1ST ID
Parent Organization: VII CORPS
Box ID: BX001008
Folder Title: DESERT STORM AFTER ACTION REPORTS
Document Number: 4
Folder Seq #: 11
UNCLASSIFIED
04/19/91
JULLS LONG REPORT
1. (U) JULLS NUMBER: 32835-63401 (00268), submitted by RILEY
AFZN-DL-T, MR ZACHARIAS, e56-3041, (913)239-3041.
2. (U) Operation DESERT SHIELD conducted by USCENTCOM on 02/05/91.
3. (U) KEYWORDS. PLANNING, RWO (REAL WORLD CPS), USA (US ARMY),
ACTIVE COMPONENT, DEPLOYMENT, STRATEGIC AIRLIFT, LOGISTICS,
TRANSPORTATION, AIRLIFT, UNFAVORABLE, COORDINATION, ORGANIZATION,
INTEROPERABILITY, CRIT3 (IMPORTANT PROBLEM).
4. (U) TITLE: LOGISTICS: PASSENGER LOADING ON AIRCRAFT
5. (U) OBSERVATION: Movement a+ passengers +ram buses to plane
was often slow and difficult to coordinate.
6. (U) DISCUSSION. Each bus load a+ passengers needed to have
briefings a+ what to expect as to loading, clearing of weapons,
loading of personal carryon items and breaking into groups 0-
smokers and non-smokers as well as key staff individuals.
Removing soldiers from the bus, briefing them all at one time
proved to be a more speedy, organized method.
7. (U) LESSON LEARNED: That all loading a+ passengers on the
aircraft originate from a centralized holding area.
B. (U) RECOMMENDED ACTION:. That a standard briefing be given to
all the passengers in a centralized area.
9. (U) COMMENTS: none
--- (U) SUBJECT: LOGISTICS
(U) INTEROF'ERABILITY: PLANNING
(U) Action managed by: LOCAL, action worked by: RAP number--
Lesson distributed by: LOCAL.
UNCLASSIFIED
1.3 -7
Document Page: First | Prev | Next | All | Image | This Release | Search
Document 517 f:/Week-26/BX001008/DESERT STORM AFTER ACTION REPORTS/special information for installation after actio:12179611150511
Control Fields 17
File Room = jul96_declassified
File Cabinet = Week-26
Box ID = BX001008
Unit = 1ST ID
Parent Organization = VII CORPS
Folder Title = DESERT STORM AFTER ACTION REPORTS
Folder Seq # = 11
Subject = SPECIAL INFORMATION FOR INSTALLATION AFTER ACTIO
Document Seq # = 4
Document Date =
Scan Date =
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 17-DEC-1996