                                                                      04/19/91
                                    JULLS LONG REPORT

           1. (U) JULLS NUMBER: 32935-94653 (00269), submitted by RILEY
           AFZN-DL-T, MR ZACHARIAS, 856-3041, (913)239-3041.

           2. (U) Operation DESERT SHIELD conducted by USCENTCOM on 02/05/91.

           3. (U) KEYWORDS: PLANNING, RWO (REAL WORLD OPS), USA (US ARMY),
           ACTIVE COMPONENT, DEPLOYMENT, STRATESIC AIRLIFT, LOGISTICS,
           TRANSPORTATION, AIRLIFT, UNFAVORABLE, PERFORMANCE,
           INTEROPERABILITY, CRIT3 (IMPORTANT PROBLEM).

           4. (U) TITLE: LOGISTICS: VEHICLE LOADING ONTO AIRCRAFT

           5. (U) OBSERVATION: Special vehicles and helicopters should be
           loaded by the assigned drivers and crew to prevent equipment
           damage.

           6. (U) DISCUSSION: The 34th Engineer personnel were required to
           drive all of the vehicles onto the aircraft. This is no problem
           for normal military vehicles, however, fire engines, equip vans,
           and vehicles that have peculiarities about them, should be
           loaded by operators that are familiar with the equipment to
           avoid aircraft damage.

           7. (U) LESSON LEARNED.: Planning for loading special vehicles or
           aircraft by the operators should be incorporated into the plan.

           B. (U) RECOMMENDED ACTION: Vehicle operators be POM'D f'irst and
           sent forward to arrive at least one hour prior to aircraft
           arrival. This may involve starting the POM early, but for
           .special equipment operators it should be done.


           9. (U) COMMENTS:    none



           ---  (U) SUBJECT: LOGISTICS


                (U) INTEROPERABII-ITY: PLANNING

                (U) Action managed by: LOCAL, action worked by:   RAP number:
                Lesson distributed by: LOCAL.















ED

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 517 f:/Week-26/BX001008/DESERT STORM AFTER ACTION REPORTS/special information for installation after actio:12179611150511
Control Fields 17
File Room = jul96_declassified
File Cabinet = Week-26
Box ID = BX001008
Unit = 1ST ID
Parent Organization = VII CORPS
Folder Title = DESERT STORM AFTER ACTION REPORTS
Folder Seq # = 11
Subject = SPECIAL INFORMATION FOR INSTALLATION AFTER ACTIO
Document Seq # = 4
Document Date =
Scan Date =
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 17-DEC-1996