                                      UNCLASSIFIED
                                                                      04/19/91
                                    JULLS LONG REPORT


           1. (U) JULLS NUMBER: 32852-90154 (00291), submitted by RILEY
           AFZN-DL-S, Ms Tanksley, 856-2811, (913)239-2811.

           2. (U) Operation DESERT SHIELD conducted by USCENTCOM on 02/05/91.

           3. (U) KEYWORDS: PLANNING, RWO (REAL WORLD OPS), USA (US ARMY),
           ACTIVE COMPONENT, LOGISTICS, SUPPLY, UNFAVORABLE, AVAILABILITY,
           SHORTAGE, INTEROPERABILITY, CRIT3 (IMPORTANT PROBLEM).

           4. (U) TITLE: Logistics: Recurring Demands at Self Service Supply
           Center/Inflated

           S. (u) OBSERVATION: All lines in SSSC are considered stockage
           lines and build up a demand history. Requisitions are
           automatically produced based on stock on hand and the number of
           demands.


           6. (u) DISCUSSION: During November and December when the
           Division units were buying their SSSC supplies preparing for
           deployment the demands were out of sight. Since all lines are
           stockage lines the system is not going to realize that this was
           an exceptional time and is going to reorder based on the demands
           experienced so far this year. All line because they are
           stockage are considered recurring. To preclude excessive
           buying, the requisitioning objective for each line must now be
           manually changed.

           7. (u) LESSON LEARNED: During high peak demands such as
           deployment/mobilization, the AUTORO system must be programed to
           accept the higher volumes.

           S. (u) RECOMMENDED ACTION: That AUTOROS be programmed to accept
           "Non-Recurring Demands" during exceptional situations.

           9. (u) COMMENTS:    none



           ---  (U) SUBJECT: LOGISTICS


                (U) INTEROPERABILITY: PLANNING

d by: LOCAL, action worked by: , RAP number:
                Lesson distributed by: LOCAL.













                                      UNCLASSIFIED

                                         @-15%

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 517 f:/Week-26/BX001008/DESERT STORM AFTER ACTION REPORTS/special information for installation after actio:12179611150511
Control Fields 17
File Room = jul96_declassified
File Cabinet = Week-26
Box ID = BX001008
Unit = 1ST ID
Parent Organization = VII CORPS
Folder Title = DESERT STORM AFTER ACTION REPORTS
Folder Seq # = 11
Subject = SPECIAL INFORMATION FOR INSTALLATION AFTER ACTIO
Document Seq # = 4
Document Date =
Scan Date =
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 17-DEC-1996